Stick system installation check

Checklist · Each zone

Checks a stick curtain wall as it goes in: mullions, transoms, brackets, splices, drainage paths and the frame's tolerance.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • CWCT standards and guidance for building envelopes (referred to, not copied)
  • The project specification and the system maker's instructions

The questions

Where and when

  1. Floor, zone, elevation or panel IDs
  2. Date

Checks

  1. Mullions plumb and in line, splices as the details
  2. Transoms level, fixed and sealed
  3. Brackets fixed and locked
  4. Drainage paths open; weep slots clear
  5. Frame within tolerance
  6. Photos

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.