Templates / Curtain walling and glazing
Glass breakage and damage report
Form · Each broken or damaged pane
Records a broken or damaged pane: which pane, what happened, how the area was made safe, and the replacement.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- GGF guidance (referred to, not copied)
The questions
The pane
- Pane ID and location
- When found
- Photos
What happened
- Likely cause
- What was found
- Area below made safe and closed off
- Replacement ordered (reference)
Sign-off
- Reported by
- Date and time
- Signature
A template to adapt to your site, not legal advice.
More curtain walling and glazing templates
- Anchor site test record
- Bracket and anchor installation check
- Cast-in channel and embed plate survey
- Facade cavity barrier inspection
- Facade first panel and benchmark approval
- Facade handover inspection
- Facade protection film removal and clean check
- Facade setting-out survey
- Facade site water test (hose test)
- Glass delivery inspection
- Glass visual quality inspection after install
- Glazing bead, setting block and toe-in check
- Glazing robot or vacuum lifter lift plan
- Membrane and EPDM seal-to-structure check
- Opening vent and door in curtain wall check
- Perimeter firestop and smoke seal at slab edge
- Pressure plate and cap torque check
- Sealant adhesion (peel) test record
- Stack joint and splice seal check
- Stick system installation check
- Structural sealant glazing check
- Unitised panel delivery inspection
- Unitised panel factory release inspection
- Unitised panel installed check
- Unitised panel lifting and installation check
- Unitised panel storage check
- All templates