Templates / Curtain walling and glazing
Glazing robot or vacuum lifter lift plan
Form · Each heavy pane or set of similar lifts
The lift plan for a heavy pane with a glazing robot or vacuum lifter: the pane's weight, the lifter's rating, the route, ground, wind, exclusion zone and the team.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Regulation 8
- The lifter's instructions
The questions
The lift
- Pane and its weight
- Weight
- Robot or lifter, and its rated load
- Rated load
- Route, ground and floor loads
- Wind limit
Safety
- Vacuum pads clean, gauge and alarm work
- Lifter examined in the last 6 months
- Exclusion zone set
- Lifting team briefed
Sign-off
- Planned by
- Date and time
- Signature
A template to adapt to your site, not legal advice.
More curtain walling and glazing templates
- Anchor site test record
- Bracket and anchor installation check
- Cast-in channel and embed plate survey
- Facade cavity barrier inspection
- Facade first panel and benchmark approval
- Facade handover inspection
- Facade protection film removal and clean check
- Facade setting-out survey
- Facade site water test (hose test)
- Glass breakage and damage report
- Glass delivery inspection
- Glass visual quality inspection after install
- Glazing bead, setting block and toe-in check
- Membrane and EPDM seal-to-structure check
- Opening vent and door in curtain wall check
- Perimeter firestop and smoke seal at slab edge
- Pressure plate and cap torque check
- Sealant adhesion (peel) test record
- Stack joint and splice seal check
- Stick system installation check
- Structural sealant glazing check
- Unitised panel delivery inspection
- Unitised panel factory release inspection
- Unitised panel installed check
- Unitised panel lifting and installation check
- Unitised panel storage check
- All templates