Glazing bead, setting block and toe-in check
Checklist · Each zone
Checks glass is bedded as the system says: setting blocks in the right places and material, location blocks, edge cover, toe-in and beads secure.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- GGF guidance (referred to, not copied)
- The project specification and the system maker's instructions
The questions
Where and when
- Floor, zone, elevation or panel IDs
- Date
Checks
- Setting blocks at the right positions and of the right material
- Edge cover as specified
- Toe-in as specified
- Beads secure and gaskets seated
- Drainage slots clear
- Photos
Sign-off
- Inspected by
- Date and time
- Signature
A template to adapt to your site, not legal advice.
More curtain walling and glazing templates
- Anchor site test record
- Bracket and anchor installation check
- Cast-in channel and embed plate survey
- Facade cavity barrier inspection
- Facade first panel and benchmark approval
- Facade handover inspection
- Facade protection film removal and clean check
- Facade setting-out survey
- Facade site water test (hose test)
- Glass breakage and damage report
- Glass delivery inspection
- Glass visual quality inspection after install
- Glazing robot or vacuum lifter lift plan
- Membrane and EPDM seal-to-structure check
- Opening vent and door in curtain wall check
- Perimeter firestop and smoke seal at slab edge
- Pressure plate and cap torque check
- Sealant adhesion (peel) test record
- Stack joint and splice seal check
- Stick system installation check
- Structural sealant glazing check
- Unitised panel delivery inspection
- Unitised panel factory release inspection
- Unitised panel installed check
- Unitised panel lifting and installation check
- Unitised panel storage check
- All templates