Templates / Curtain walling and glazing
Facade handover inspection
Checklist · Each floor or elevation
The inspection before a floor or elevation of facade is handed over: complete, clean, seals and caps on, snags listed, records in place.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- CWCT standards and guidance for building envelopes (referred to, not copied)
- The project specification and the system maker's instructions
The questions
Where and when
- Floor, zone, elevation or panel IDs
- Date
Checks
- Every panel, cap and seal complete
- Clean and film removed
- Snags listed and passed on
- QA records for the area complete
- Photos
Actions
- Anything found that needs putting right (write "None" if nothing)
- Action taken or who it was passed to
Sign-off
- Inspected by
- Date and time
- Signature
A template to adapt to your site, not legal advice.
More curtain walling and glazing templates
- Anchor site test record
- Bracket and anchor installation check
- Cast-in channel and embed plate survey
- Facade cavity barrier inspection
- Facade first panel and benchmark approval
- Facade protection film removal and clean check
- Facade setting-out survey
- Facade site water test (hose test)
- Glass breakage and damage report
- Glass delivery inspection
- Glass visual quality inspection after install
- Glazing bead, setting block and toe-in check
- Glazing robot or vacuum lifter lift plan
- Membrane and EPDM seal-to-structure check
- Opening vent and door in curtain wall check
- Perimeter firestop and smoke seal at slab edge
- Pressure plate and cap torque check
- Sealant adhesion (peel) test record
- Stack joint and splice seal check
- Stick system installation check
- Structural sealant glazing check
- Unitised panel delivery inspection
- Unitised panel factory release inspection
- Unitised panel installed check
- Unitised panel lifting and installation check
- Unitised panel storage check
- All templates