Unitised panel installed check
Checklist · Each panel
The check of a panel once in place: level, line and plumb against tolerance, stack and interlock joints, gaskets, and its fixing locked.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- CWCT standards and guidance for building envelopes (referred to, not copied)
- The project specification and the system maker's instructions
The questions
The panel
- Panel ID
- Floor and elevation
- Date
Checks
- Level, line and plumb within tolerance
- Stack joint width within tolerance
- Interlocks engaged along the full length
- Gaskets continuous, corners sealed
- Fixing locked (anti-lift bolt or lock in)
- Photos
Sign-off
- Inspected by
- Date and time
- Signature
A template to adapt to your site, not legal advice.
More curtain walling and glazing templates
- Anchor site test record
- Bracket and anchor installation check
- Cast-in channel and embed plate survey
- Facade cavity barrier inspection
- Facade first panel and benchmark approval
- Facade handover inspection
- Facade protection film removal and clean check
- Facade setting-out survey
- Facade site water test (hose test)
- Glass breakage and damage report
- Glass delivery inspection
- Glass visual quality inspection after install
- Glazing bead, setting block and toe-in check
- Glazing robot or vacuum lifter lift plan
- Membrane and EPDM seal-to-structure check
- Opening vent and door in curtain wall check
- Perimeter firestop and smoke seal at slab edge
- Pressure plate and cap torque check
- Sealant adhesion (peel) test record
- Stack joint and splice seal check
- Stick system installation check
- Structural sealant glazing check
- Unitised panel delivery inspection
- Unitised panel factory release inspection
- Unitised panel lifting and installation check
- Unitised panel storage check
- All templates