Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / Curtain walling and glazing

Membrane and EPDM seal-to-structure check

Checklist · Each zone

Checks the vapour control and breather membranes and the EPDM seals to the structure: the right membrane each side, lapped, bonded and continuous.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • CWCT standards and guidance for building envelopes (referred to, not copied)
  • The project specification and the system maker's instructions

The questions

Where and when

  1. Floor, zone, elevation or panel IDs
  2. Date

Checks

  1. Right membrane on the warm and cold sides
  2. Laps and bonding as the maker says
  3. Continuous at corners and penetrations
  4. Primer used where needed
  5. Photos

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More curtain walling and glazing templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA