Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / Plant

Plant pre-use check

Checklist · Before use, each shift

The operator's daily check before using a machine.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Provision and Use of Work Equipment Regulations 1998, regulations 5 and 6
  • HSE, Using work equipment safely

The questions

The machine

  1. Machine and plant number
  2. Hour meter reading
  3. Operator

Checks

  1. Walk round: no damage, leaks or loose parts
  2. Fuel, oil, coolant and hydraulic levels
  3. Tyres or tracks in good condition
  4. Lights, beacon and reversing alarm work
  5. Seat belt and ROPS / FOPS in good order
  6. Brakes and steering work
  7. Controls, emergency stop and interlocks work
  8. Mirrors and cameras clean and working
  9. Result
  10. Operator's signature

A template to adapt to your site, not legal advice.

More plant templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA