Templates / Plant
Plant pre-use check
Checklist · Before use, each shift
The operator's daily check before using a machine.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Provision and Use of Work Equipment Regulations 1998, regulations 5 and 6
- HSE, Using work equipment safely
The questions
The machine
- Machine and plant number
- Hour meter reading
- Operator
Checks
- Walk round: no damage, leaks or loose parts
- Fuel, oil, coolant and hydraulic levels
- Tyres or tracks in good condition
- Lights, beacon and reversing alarm work
- Seat belt and ROPS / FOPS in good order
- Brakes and steering work
- Controls, emergency stop and interlocks work
- Mirrors and cameras clean and working
- Result
- Operator's signature
A template to adapt to your site, not legal advice.
More plant templates
- 360 excavator (over 6 t) pre-use check
- Concrete pump (boom) set-up and pre-use check
- Dumper pre-use check
- Excavator pre-use check
- Forklift pre-use check
- Forklift thorough examination record
- Fuel bowser and fuel storage check
- Lighting tower check
- Mini or midi excavator pre-use check
- Piling rig pre-use check
- Plant operator competence check
- Plant weekly inspection
- PUWER work equipment register
- Roller pre-use check
- Rotating telehandler pre-use check
- Rough-terrain forklift pre-use check
- Skid steer and compact plant pre-use check
- Swivel or high-tip dumper pre-use check
- Telehandler attachment change record
- Telehandler pre-use check
- Tracked dumper or power barrow pre-use check
- Wheeled excavator pre-use check
- All templates