Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / Plant

Piling rig pre-use check

Checklist · Every day before use

The operator's daily check of a piling rig: the working platform, mast and its locks, ropes, auger guarding and exclusion zone.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Provision and Use of Work Equipment Regulations 1998 (PUWER), Regulations 4, 5 and 6 (suitability, maintenance, inspection)
  • The manufacturer's instructions
  • Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Regulation 9
  • BRE BR 470, Working platforms for tracked plant

The questions

The machine

  1. Make, model and fleet number
  2. Operator
  3. Hour meter

Walk round

  1. No fluid leaks; oil, coolant and hydraulic levels right
  2. Tyres or tracks sound, wheel nuts tight
  3. No damage to the body, cab, guards or steps
  4. Glass, mirrors and cameras clean and unbroken

This machine

  1. Working platform certificate in place, and the ground as it describes
  2. Mast and its locks sound
  3. Ropes and sheaves sound
  4. Auger and rotating parts guarded; exclusion zone set out

Started up

  1. Lights, beacon and horn work
  2. Reversing alarm or warning device works
  3. Brakes and parking brake work
  4. Controls work and return to neutral
  5. Result

Sign-off

  1. Checked by the operator
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More plant templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA