Concrete pump (boom) set-up and pre-use check

Checklist · Every day before use

The check when a boom pump is set up: outriggers on firm ground with pads, the boom and pipeline clamps, the end hose, the exclusion zone and the hand signals agreed.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Provision and Use of Work Equipment Regulations 1998 (PUWER), Regulations 4, 5 and 6 (suitability, maintenance, inspection)
  • The manufacturer's instructions
  • BS EN 12001, Conveying, spraying and placing machines for concrete
  • CPA guidance (referred to, not copied)

The questions

The machine

  1. Make, model and fleet number
  2. Operator
  3. Hour meter

Walk round

  1. No fluid leaks; oil, coolant and hydraulic levels right
  2. Tyres or tracks sound, wheel nuts tight
  3. No damage to the body, cab, guards or steps
  4. Glass, mirrors and cameras clean and unbroken

This machine

  1. Outriggers fully out on pads, on ground checked for the loads
  2. Pipeline clamps and pins secure
  3. End hose sound, no restraint chain missing
  4. Clear of overhead lines by the safe distance
  5. Exclusion zone set; signaller and signals agreed

Started up

  1. Lights, beacon and horn work
  2. Reversing alarm or warning device works
  3. Brakes and parking brake work
  4. Controls work and return to neutral
  5. Result

Sign-off

  1. Checked by the operator
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.