Templates / Plant
Forklift thorough examination record
Form · Every 12 months (6 if it lifts people or carries attachments)
Keeps the thorough examination of a forklift truck on site: the competent person's report attached, any defects and what was done about them, and when the next is due. The equipment isn't used past that date.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Regulation 9 (thorough examination) and regulation 10 (reports and defects)
- Provision and Use of Work Equipment Regulations 1998, Regulation 6
The questions
The equipment
- Make, model and serial or fleet number
- Where it is on site
The thorough examination
- Date of the examination
- Examined by (competent person and company)
- The examiner's report
- Defects that are or could become a danger reported
- What was done about each defect, and when
- Next thorough examination due
Sign-off
- Recorded by
- Date and time
- Signature
A template to adapt to your site, not legal advice.
More plant templates
- 360 excavator (over 6 t) pre-use check
- Concrete pump (boom) set-up and pre-use check
- Dumper pre-use check
- Excavator pre-use check
- Forklift pre-use check
- Fuel bowser and fuel storage check
- Lighting tower check
- Mini or midi excavator pre-use check
- Piling rig pre-use check
- Plant operator competence check
- Plant pre-use check
- Plant weekly inspection
- PUWER work equipment register
- Roller pre-use check
- Rotating telehandler pre-use check
- Rough-terrain forklift pre-use check
- Skid steer and compact plant pre-use check
- Swivel or high-tip dumper pre-use check
- Telehandler attachment change record
- Telehandler pre-use check
- Tracked dumper or power barrow pre-use check
- Wheeled excavator pre-use check
- All templates