Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / Groundworks and drainage

Foundation excavation inspection

Checklist · Each foundation, before concrete

The check of a foundation trench or base before concrete: dimensions and depth, the bearing stratum, soft spots, roots, water, and building control's acceptance.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Building Regulations 2010, Part A (structure)
  • Approved Document A
  • The project specification and drawings

The questions

Where and when

  1. Plot, grid or base
  2. Date

Checks

  1. Width and depth as the drawings
  2. Bottom on the bearing stratum the engineer expects
  3. No soft spots, roots or made ground left
  4. No standing water; bottom clean
  5. Depth right for nearby trees (NHBC or the engineer's table)
  6. Building control or the engineer has seen it
  7. Photos

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More groundworks and drainage templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA