Templates / Groundworks and drainage
Above-ground drainage test (soil and waste)
Form · Each stack or system, before it is boxed in
Records the air test of soil and waste pipework above ground before it is hidden: the system, the test pressure held, the result and who witnessed it.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Building Regulations 2010, Part H, H1 (sanitary pipework air test)
- BS EN 12056, Gravity drainage systems inside buildings
The questions
The system
- Stack or system tested (plot, floor)
- Test pressure
- Time held
Result
- Result
- Tested by
- Witnessed by
- Signature
A template to adapt to your site, not legal advice.