Drainage pipe laying and bedding inspection

Checklist · Each run, before backfill

The quality check of a drain run before it is covered: the bed, line and gradient, joints, the pipe's surround and protection, and photos as it lies.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • BS EN 1610, Construction and testing of drains and sewers
  • Building Regulations 2010, Part H (drainage)

The questions

The run

  1. From (manhole or chamber)
  2. To
  3. Pipe diameter
  4. Fall (as designed, and as laid)

Checks

  1. Bedding to the specified material and depth
  2. Line and gradient as the drawing
  3. Joints fully home, seals in place
  4. Surround and cover as specified
  5. Protection where the cover is shallow or under a road
  6. Tested before backfill
  7. Photos of the run as laid

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.