Templates / Building Regulations and handover
Part F ventilation commissioning
Form · Each dwelling or unit tested
Records the commissioning of a dwelling's mechanical ventilation: each terminal's measured air flow against its design rate, the commissioning sheet, and the notice to building control.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Building Regulations 2010, Part F and regulation 42 (mechanical ventilation air flow rate testing)
- Approved Document F, Volume 1
The questions
What was tested
- Plot, dwelling or unit
- House type or room pair
The test
- Tested by (company)
- Tester and their registration
- Date of the test
- Design air flow (whole system or the terminal tested)
- Result
- Outcome
- Test report
- Terminals
Building control
- Results given to building control within 5 days of the final test
- Date given
Sign-off
- Recorded by
- Date and time
- Signature
A template to adapt to your site, not legal advice.