Templates / Building Regulations and handover
Golden thread information check (higher-risk buildings)
Checklist · Each stage, and before completion
Checks a higher-risk building's golden thread of information is kept as the Building Safety Act asks: digital, kept up to date, changes recorded through change control, and the occurrences reported.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Building Safety Act 2022, Section 88 (information and documents)
- Higher-Risk Buildings (Management of Safety Risks etc) (England) Regulations 2023
- Building (Higher-Risk Buildings Procedures) (England) Regulations 2023
The questions
Where and when
- Building and stage
- Date
Checks
- Information kept digitally, in one place, with one version of each document
- Changes to the approved design recorded through change control (major changes approved by the regulator)
- As-built drawings and products match what is recorded
- Mandatory occurrences reported to the Building Safety Regulator
- Fire and structural safety information up to date
- The people who need it can read it
Actions
- Anything found that needs putting right (write "None" if nothing)
- Action taken or who it was passed to
Sign-off
- Inspected by
- Date and time
- Signature
A template to adapt to your site, not legal advice.