Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / Building Regulations and handover

Part M accessibility check

Checklist · Each dwelling, before completion

Checks a dwelling is built to the access standard it was approved to (M4(1), M4(2) or M4(3)): approach, entrance, door and hall widths, switches and sockets, WC.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Building Regulations 2010, Part M (access to and use of buildings)
  • Approved Document M, Volume 1

The questions

The dwelling

  1. Plot
  2. Standard approved
  3. Date

Checks

  1. Approach route level or gently sloping, as the standard
  2. Entrance door clear width and level threshold
  3. Internal door and hall widths as the standard
  4. Switches and sockets at the set heights
  5. WC at entrance level where required, with its space

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More building regulations and handover templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA