Templates / Building Regulations and handover
Part M accessibility check
Checklist · Each dwelling, before completion
Checks a dwelling is built to the access standard it was approved to (M4(1), M4(2) or M4(3)): approach, entrance, door and hall widths, switches and sockets, WC.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Building Regulations 2010, Part M (access to and use of buildings)
- Approved Document M, Volume 1
The questions
The dwelling
- Plot
- Standard approved
- Date
Checks
- Approach route level or gently sloping, as the standard
- Entrance door clear width and level threshold
- Internal door and hall widths as the standard
- Switches and sockets at the set heights
- WC at entrance level where required, with its space
Sign-off
- Inspected by
- Date and time
- Signature
A template to adapt to your site, not legal advice.