Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / Building Regulations and handover

Handover pack check

Checklist · Before handover

Checks everything the client must receive is in the handover pack: the health and safety file, O&M manuals, certificates and test results, warranties, and the fire safety information regulation 38 asks for.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Construction (Design and Management) Regulations 2015, Regulation 12(5)–(10) (health and safety file)
  • Building Regulations 2010, Regulation 38 (fire safety information)

The questions

Handed over

  1. Building, plot or area
  2. Handed to
  3. Date

Checks

  1. Health and safety file complete and handed over
  2. O&M manuals for every system
  3. Certificates: electrical, gas, commissioning, test results
  4. EPC and energy calculations (BREL)
  5. Fire safety information (regulation 38) handed to the responsible person
  6. Warranties and guarantees, with their start dates
  7. Building control completion certificate
  8. Keys, codes and fobs logged and handed over
  9. The pack or its index

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More building regulations and handover templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA