Templates / Small plant and tools
110 V transformer and lead check
Checklist · Every week
Checks 110 V transformers, extension leads and splitters are sound and in their test date, so tools on site stay at reduced low voltage.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Electricity at Work Regulations 1989, Regulation 4 (systems maintained to prevent danger)
- HSE HSG141, Electrical safety on construction sites
The questions
Where and when
- Area or location
- Date
Checks
- Transformer cases not cracked; sockets and covers intact
- Leads not cut, crushed or taped
- Plugs and connectors secure, no exposed wires
- Test labels in date
- Leads routed off the floor or protected, not a trip hazard
Actions
- Anything found that needs putting right (write "None" if nothing)
- Action taken or who it was passed to
Sign-off
- Checked by
- Date and time
- Signature
A template to adapt to your site, not legal advice.
More small plant and tools templates
- Abrasive wheel mounting record
- Cartridge-operated tool check
- Compressor and air line check
- Cut-off saw pre-use check
- Generator pre-use check
- Portable appliance inspection
- Portable appliance register
- Pressure system written scheme examination record
- Temporary site electrics inspection
- Welding and gas cylinder check
- All templates