Templates / Small plant and tools

Generator pre-use check

Checklist · Before each use

The check of a site generator before use: placed safely, earthed, its RCD tested, leads sound and fuel stored safely.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Electricity at Work Regulations 1989, Regulations 4, 7 and 8
  • Provision and Use of Work Equipment Regulations 1998 (PUWER), Regulation 5

The questions

The generator

  1. Generator number
  2. Where it is

Checks

  1. Outside or well ventilated, away from doors and windows (fumes)
  2. Earthed as the maker says
  3. RCD tested with its test button
  4. Sockets, cover and plugs undamaged
  5. Leads not damaged and routed out of the way
  6. Refuelled only when stopped and cool; fuel stored away from it
  7. Result

Sign-off

  1. Checked by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.