Templates / Small plant and tools
Compressor and air line check
Checklist · Before each use
The check of a compressor and its hoses before use: the receiver's examination in date, safety valve, gauges, hoses, whip checks and couplings.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Pressure Systems Safety Regulations 2000, Regulations 7, 8 and 9
- Provision and Use of Work Equipment Regulations 1998 (PUWER), Regulation 5
The questions
The compressor
- Compressor number
Checks
- Written scheme examination in date (where it has a receiver)
- Safety valve and pressure gauge work
- Hoses not cut, kinked or perished
- Whip checks fitted at the couplings
- Couplings right for the pressure and secure
- Result
Sign-off
- Checked by
- Date and time
- Signature
A template to adapt to your site, not legal advice.
More small plant and tools templates
- 110 V transformer and lead check
- Abrasive wheel mounting record
- Cartridge-operated tool check
- Cut-off saw pre-use check
- Generator pre-use check
- Portable appliance inspection
- Portable appliance register
- Pressure system written scheme examination record
- Temporary site electrics inspection
- Welding and gas cylinder check
- All templates