Templates / Small plant and tools

Temporary site electrics inspection

Checklist · Every week (a formal inspection and test at least every 3 months)

Checks the site's temporary electrical installation: distribution boards locked and labelled, RCDs tested, cables protected and routed, and the periodic test in date.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Electricity at Work Regulations 1989, Regulation 4
  • BS 7375, Distribution of electricity on construction sites
  • BS 7671, Section 704 (construction sites)

The questions

Where and when

  1. Area or location
  2. Date

Checks

  1. Distribution boards locked, labelled and weatherproof
  2. RCDs tested with their test buttons
  3. Cables protected, routed overhead or buried and marked
  4. No damaged cables, plugs or sockets
  5. Formal inspection and test (at least every 3 months) in date, certificate on site

Actions

  1. Anything found that needs putting right (write "None" if nothing)
  2. Action taken or who it was passed to

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.