Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / MEWPs, mast climbers and hoists

Scissor lift pre-use check

Checklist · Every day before use

The operator's check of a scissor lift before use: pothole guards, tilt alarm, platform gates and rails, emergency lowering and the ground it will work on.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Provision and Use of Work Equipment Regulations 1998 (PUWER), Regulations 4, 5 and 6 (suitability, maintenance, inspection)
  • The manufacturer's instructions
  • BS 8460, Safe use of MEWPs, code of practice
  • IPAF pre-use inspection guidance (referred to, not copied)

The questions

The machine

  1. Make, model and fleet number
  2. Operator
  3. Hour meter

Walk round

  1. No fluid leaks; oil, coolant and hydraulic levels right
  2. Tyres or tracks sound, wheel nuts tight
  3. No damage to the body, cab, guards or steps
  4. Glass, mirrors and cameras clean and unbroken

This machine

  1. Pothole guards deploy when raised
  2. Tilt alarm works
  3. Platform rails, gate and toe boards secure, gate self-closes
  4. Emergency lowering works and the ground person knows it
  5. Overload sensing works (where fitted)
  6. Ground firm and level enough, no voids, covers or slopes

Started up

  1. Lights, beacon and horn work
  2. Reversing alarm or warning device works
  3. Brakes and parking brake work
  4. Controls work and return to neutral
  5. Result

Sign-off

  1. Checked by the operator
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More mewps, mast climbers and hoists templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA