Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / MEWPs, mast climbers and hoists

Hoist daily check

Checklist · Every day before use

The check before a passenger or goods hoist is used each day: base enclosure, landing gates and their interlocks, controls, emergency stop and the mast ties.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Regulation 9(3) (inspection at suitable intervals)
  • Provision and Use of Work Equipment Regulations 1998 (PUWER), Regulation 6
  • The manufacturer's instructions

The questions

The hoist

  1. Hoist and fleet number
  2. Where on site

Checks

  1. Base enclosure complete, gate shut and interlocked
  2. Every landing gate shut and interlocked; the car won't move with one open
  3. Controls and emergency stop work
  4. Mast ties in place as the design shows
  5. Safe working load (and number of people) shown on the car
  6. Top and bottom limits stop the car
  7. Thorough examination in date, report on site
  8. Result

Actions

  1. Anything found that needs putting right (write "None" if nothing)
  2. Action taken or who it was passed to

Sign-off

  1. Checked by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More mewps, mast climbers and hoists templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA