Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / MEWPs, mast climbers and hoists

MEWP weekly inspection

Checklist · Every week, as the risk assessment and the maker's instructions set

The weekly inspection of a mobile elevating work platform (scissor lift, cherry picker, boom): controls, emergency lowering, platform, guard rails, tyres, outriggers and its thorough examination in date.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Provision and Use of Work Equipment Regulations 1998 (PUWER), Regulation 6 (inspection)
  • Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Regulation 9
  • The manufacturer's instructions

The questions

The MEWP

  1. Make, model and fleet number
  2. Where on site
  3. Hour meter

Checks

  1. Platform and ground controls work, labelled
  2. Emergency stops work at both controls
  3. Emergency lowering works and the operator knows how
  4. Platform guard rails, gate and anchor points sound
  5. Tilt and overload alarms work
  6. Tyres, wheels and outriggers sound
  7. No hydraulic leaks; hoses not damaged
  8. Safe working load and instructions on the platform
  9. Thorough examination (every 6 months) in date, report on site
  10. Result

Actions

  1. Anything found that needs putting right (write "None" if nothing)
  2. Action taken or who it was passed to

Sign-off

  1. Checked by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More mewps, mast climbers and hoists templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA