Templates / Fire stopping and fire doors

Fire door installation check

Checklist · Each door, on installation

Checks a fire door is installed as its certificate allows: the certified set, frame fixed and fire-stopped, gaps, ironmongery that is part of the test, seals, closer and signage.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • BS 8214, Timber-based fire door assemblies, code of practice
  • Building Regulations 2010, Part B

The questions

Where and when

  1. Door reference
  2. Date

Checks

  1. Leaf and frame from the certified set; label or plug present
  2. Frame fixed and the gap to the wall fire-stopped
  3. Gaps as the certificate (about 3 mm)
  4. Hinges, locks and closer are the ones the certificate covers
  5. Seals fitted
  6. Signage fitted
  7. Photos

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.