Compartmentation inspection

Checklist · Each compartment wall or floor, before it is covered

The check of a compartment wall or floor before it is hidden: built to the full height, its head detail, every penetration sealed, cavity barriers and dampers in place, with photos for the golden thread.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Building Regulations 2010, Part B (B3 internal fire spread, structure)
  • Approved Document B
  • ASFP guidance (referred to, not copied)

The questions

Where and when

  1. Wall or floor, and its fire rating
  2. Date

Checks

  1. Wall runs the full height to the soffit or roof deck
  2. Head detail (deflection head) as the tested system
  3. Every penetration sealed with a tested system for that service and wall
  4. Cavity barriers where the drawings show them
  5. Fire dampers fitted where ducts cross
  6. Boards, layers and fixings as the system's data sheet
  7. Photos before it is covered

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.