Templates / Fire stopping and fire doors
Cavity barrier and fire break inspection
Checklist · Each area, before it is closed in
Checks cavity barriers and fire breaks in walls, floors and roof voids: in every place the drawings show, the right product, fixed, and tight to the cavity with no gaps.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Building Regulations 2010, Part B
- Approved Document B
- The project specification and drawings
The questions
Where and when
- Plot, wall or void
- Date
Checks
- At every position the drawings show
- The product specified
- Tight to both sides, no gaps
- Fixed as the maker says
- Photos before it is covered
Sign-off
- Inspected by
- Date and time
- Signature
A template to adapt to your site, not legal advice.