Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / Fire stopping and fire doors

Cavity barrier and fire break inspection

Checklist · Each area, before it is closed in

Checks cavity barriers and fire breaks in walls, floors and roof voids: in every place the drawings show, the right product, fixed, and tight to the cavity with no gaps.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Building Regulations 2010, Part B
  • Approved Document B
  • The project specification and drawings

The questions

Where and when

  1. Plot, wall or void
  2. Date

Checks

  1. At every position the drawings show
  2. The product specified
  3. Tight to both sides, no gaps
  4. Fixed as the maker says
  5. Photos before it is covered

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More fire stopping and fire doors templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA