Templates / Lifting
Webbing sling and roundsling check
Checklist · Before each use
The user's check of a web sling or roundsling before use: label readable with its working load limit, no cuts, burns, chemical damage or broken stitching, and examined in the last 6 months.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Regulations 7 and 9
- LEEA guidance (referred to, not copied)
The questions
The item
- Sling identity
- User
- Date
Checks
- Label present and readable, with its working load limit
- No cuts, tears, holes or abrasion
- No burns, heat or chemical damage
- Stitching and eyes sound
- Examined in the last 6 months (colour code or register)
- Result
Sign-off
- Checked by
- Date and time
- Signature
A template to adapt to your site, not legal advice.
More lifting templates
- Chain block and lever hoist pre-use check
- Crane thorough examination record
- Excavator lifting duties check
- Lift plan
- Lifting accessories pre-use check
- Lifting accessories register
- Lifting appointments record
- Lifting equipment: thorough examination record
- Lifting equipment: weekly check
- LOLER lifting equipment register
- Lorry loader (HIAB) pre-use check
- Scaffold hoist and ladder hoist check
- Telehandler lifting attachment and man basket check
- Vacuum lifter thorough examination record
- All templates