Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / Lifting

Lifting accessories pre-use check

Checklist · Before each use

The check of slings, chains, shackles and hooks before a lift: marked with their safe working load, in date, and free of damage.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), Regulations 4, 7 (marking) and 9
  • LEEA guidance on lifting accessories (referred to, not copied)

The questions

Where and when

  1. Area or location
  2. Date

Checks

  1. Every item marked with its safe working load and an identity
  2. Every item examined in the last 6 months (colour code or register)
  3. Web slings: no cuts, burns, stitching damage; label readable
  4. Chains: no stretched, bent or worn links; hooks not opened up
  5. Shackles: right pin, not bent; threads sound
  6. The accessories are right for this load and the angle of lift
  7. Result

Sign-off

  1. Checked by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More lifting templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA