Post-pour inspection

Checklist · Each pour, after striking

The check after formwork is struck: surface finish, honeycombing and cracks, dimensions and levels, cast-ins where they should be, and repairs needed.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • The project specification and drawings

The questions

Where and when

  1. Pour reference
  2. Date

Checks

  1. Surface finish as specified
  2. No honeycombing, blowholes beyond spec, or cracks
  3. Dimensions and levels within tolerance
  4. Cast-ins and openings in the right place
  5. Repairs needed (write "None" if none)
  6. Photos

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.