Concrete pour record
Form · Each pour
Records a pour: the mix ordered and delivered, every ticket, slump and temperature checks, test cubes taken, the times, and curing.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- BS 8500, Concrete, complementary British Standard to BS EN 206
- The project specification and drawings
The questions
The pour
- Pour reference
- Mix ordered (strength class, designation)
- Volume
- Supplier
Loads
- Delivery tickets
- Photos of the tickets
- No water added on site beyond what the supplier allows
Tests
- Test cubes taken
- Cube references
- Air temperature
Finishing
- Pour started
- Pour finished
- Curing method
- Photos
Sign-off
- Recorded by
- Date and time
- Signature
A template to adapt to your site, not legal advice.