Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / Scaffolding and access

Open edge check during frame and floors

Checklist · Every day while frame and floors go up

The daily check while the frame and floors are being built: every leading or open edge protected, nets or other fall protection in place, and exclusion zones below.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • Work at Height Regulations 2005, Regulations 6 and 10 (falling objects)

The questions

Where and when

  1. Level and area
  2. Date

Checks

  1. Every open edge protected, or nobody can reach it
  2. Nets, airbags or other fall protection in place below, as the plan says
  3. Decking and floors fixed down as they go, no loose sheets
  4. Exclusion zone below for falling materials, marked and kept
  5. Tools and materials secured against falling

Actions

  1. Anything found that needs putting right (write "None" if nothing)
  2. Action taken or who it was passed to

Sign-off

  1. Checked by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More scaffolding and access templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA