Templates / Scaffolding and access

Mobile tower inspection

Checklist · Before first use, after it is moved or altered, after bad weather, and every 7 days

The inspection report the Work at Height Regulations require for a mobile access tower: after it is put up, moved or altered, after anything that could affect it, and at least every 7 days while it stands.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

The questions

The inspection

  1. Inspection carried out for (name) (Work at Height Regulations 2005, Schedule 7, paragraph 1)
  2. Their address (Work at Height Regulations 2005, Schedule 7, paragraph 1)
  3. Where the tower is (Work at Height Regulations 2005, Schedule 7, paragraph 2)
  4. Description of the tower (make, platform height, bases, stabilisers or outriggers) (Work at Height Regulations 2005, Schedule 7, paragraph 3)
  5. Date and time of the inspection (Work at Height Regulations 2005, Schedule 7, paragraph 4)

Checks

  1. Ground firm and level; base plates or castors sound
  2. Castors locked and wheels braked
  3. Stabilisers or outriggers fitted as the manual says
  4. Frames, braces and locks all fitted and locked, nothing damaged
  5. Tower plumb
  6. Platforms secure, trapdoor working
  7. Guard rails, intermediate rails and toe boards on every working platform
  8. Height within the manual's limit for its base and use (indoors or out)
  9. Inspection tag filled in
  10. Result

Findings and sign-off

  1. Anything found that could put anyone's health or safety at risk (write "None" if nothing) (Work at Height Regulations 2005, Schedule 7, paragraph 5)
  2. Action taken because of it (write "None" if none needed) (Work at Height Regulations 2005, Schedule 7, paragraph 6)
  3. Further action needed (write "None" if none) (Work at Height Regulations 2005, Schedule 7, paragraph 7)
  4. Inspected by (name) (Work at Height Regulations 2005, Schedule 7, paragraph 8)
  5. Their position (Work at Height Regulations 2005, Schedule 7, paragraph 8)
  6. Signature of the person making the report

A template to adapt to your site, not legal advice.