Mobile tower inspection
Checklist · Before first use, after it is moved or altered, after bad weather, and every 7 days
The inspection report the Work at Height Regulations require for a mobile access tower: after it is put up, moved or altered, after anything that could affect it, and at least every 7 days while it stands.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Work at Height Regulations 2005, Regulation 12 and Schedule 7
- The tower manufacturer's instruction manual
- HSE, Using mobile access towers safely
The questions
The inspection
- Inspection carried out for (name) (Work at Height Regulations 2005, Schedule 7, paragraph 1)
- Their address (Work at Height Regulations 2005, Schedule 7, paragraph 1)
- Where the tower is (Work at Height Regulations 2005, Schedule 7, paragraph 2)
- Description of the tower (make, platform height, bases, stabilisers or outriggers) (Work at Height Regulations 2005, Schedule 7, paragraph 3)
- Date and time of the inspection (Work at Height Regulations 2005, Schedule 7, paragraph 4)
Checks
- Ground firm and level; base plates or castors sound
- Castors locked and wheels braked
- Stabilisers or outriggers fitted as the manual says
- Frames, braces and locks all fitted and locked, nothing damaged
- Tower plumb
- Platforms secure, trapdoor working
- Guard rails, intermediate rails and toe boards on every working platform
- Height within the manual's limit for its base and use (indoors or out)
- Inspection tag filled in
- Result
Findings and sign-off
- Anything found that could put anyone's health or safety at risk (write "None" if nothing) (Work at Height Regulations 2005, Schedule 7, paragraph 5)
- Action taken because of it (write "None" if none needed) (Work at Height Regulations 2005, Schedule 7, paragraph 6)
- Further action needed (write "None" if none) (Work at Height Regulations 2005, Schedule 7, paragraph 7)
- Inspected by (name) (Work at Height Regulations 2005, Schedule 7, paragraph 8)
- Their position (Work at Height Regulations 2005, Schedule 7, paragraph 8)
- Signature of the person making the report
A template to adapt to your site, not legal advice.
More scaffolding and access templates
- Aluminium mobile tower build and handover inspection
- Combination or telescopic ladder pre-use check
- Edge protection inspection
- Harness and lanyard pre-use check
- Harness and lanyard register
- Ladder and stepladder pre-use check
- Ladder and stepladder register
- Leaning ladder pre-use and tie check
- MEWP rescue plan
- Open edge check during frame and floors
- Podium step pre-use check
- Rescue plan for work at height
- Scaffold inspection
- Stair tower inspection
- Stepladder pre-use check
- All templates