Construction phase plan review
Checklist · When the work or the risks change
Checks the construction phase plan still matches the work: its arrangements, site rules and the risks it names, and records what was changed.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Construction (Design and Management) Regulations 2015, Regulation 12 (construction phase plan, reviewed and revised as needed)
- HSE L153, Managing health and safety in construction
The questions
Where and when
- Project
- Date
The review
- Why it is being reviewed (new phase, new trade, an incident, a change in the design)
- Arrangements for managing the work still right (who does what, communication, cooperation)
- Site rules still right and briefed
- The risks of the work coming up are in it, with how they are controlled
- Emergency arrangements still right for the site as it is now
- What was changed in the plan
- The changes have been briefed to the people they affect
Sign-off
- Reviewed by
- Date and time
- Signature
A template to adapt to your site, not legal advice.
More health and safety templates
- Asbestos survey check before work
- Client or principal designer site visit
- COSHH assessment
- COSHH substances register
- Daily site briefing
- Dust and silica control check
- Dynamic risk assessment for a changed task
- Hand-arm vibration: daily exposure
- Hazard report
- Health surveillance referral record
- Incident report
- Lead and hazardous substance exposure check
- Manual handling assessment
- Monthly health and safety audit
- Near miss report
- Noise assessment
- Noise: daily exposure
- Point of work risk assessment (Take 5)
- PPE inspection
- PPE issue record
- RAMS review and acceptance
- RPE face fit test record
- Subcontractor health and safety check
- Toolbox talk
- Weekly fire point check
- Weekly site safety inspection
- Young person or new starter risk assessment
- All templates