Templates / Structural steel
Steel erection inspection
Checklist · Each bay or level
The check of erected steelwork: line, level and plumb within tolerance, bolts the right grade and tightened, packs and grout, and temporary bracing kept until the frame is stable.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- BS EN 1090-2, Execution of steel structures
- National Structural Steelwork Specification (referred to, not copied)
- The project specification and drawings
The questions
Where and when
- Grid lines and level
- Date
Checks
- Columns plumb, beams level, within tolerance
- Bolts the right grade, all in, tightened as specified
- Packs and shims as specified; grout done
- Temporary bracing in place until the frame is stable
- Coating damage touched up
- Photos
Sign-off
- Inspected by
- Date and time
- Signature
A template to adapt to your site, not legal advice.