Templates / Site set-up and welfare
Site set-up checklist
Checklist · Once, before work starts (and when the site changes a lot)
Checks a site is ready before work starts: its boundary, safe ways in and around, signs, welfare, first aid, fire points and the construction phase plan.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- Construction (Design and Management) Regulations 2015, Regulations 12, 15, 18, 19 and Schedule 2 (welfare)
- HSE HSG150, Health and safety in construction
The questions
Where and when
- Site
- Date
Boundary and access
- The site is fenced or hoarded so the public can't get in
- Gates lock, and are kept shut when nobody's watching them
- Pedestrian and vehicle routes are kept apart, marked and lit
- The public are protected where work meets a pavement or road
Signs and information
- Site board with the principal contractor's name and emergency contact
- The HSE notification (F10) is displayed where the project needs one
- PPE and hazard signs at the entrance
- The construction phase plan is in place before work starts
Welfare (CDM Schedule 2)
- Toilets, enough for the people on site, kept clean and lit
- Washing facilities with hot and cold (or warm) running water, soap and towels or dryers
- Drinking water, marked as such, with cups or a fountain
- Somewhere to change, dry and keep clothes
- A rest area with tables, seats and a way to heat food and boil water
Emergencies
- First aid kit stocked, and a first aider or appointed person named
- Fire points with extinguishers and an alarm, in reach of every work area
- Assembly point marked and the emergency plan on the notice board
- Induction ready for everyone before they start
Actions
- Anything found that needs putting right (write "None" if nothing)
- Action taken or who it was passed to
Sign-off
- Checked by
- Date and time
- Signature
A template to adapt to your site, not legal advice.