Sitro · Features · Compare · Guides · Templates · Pricing · Roadmap

Templates / Floors and finishes

Screed check

Checklist · Each area

The check of a screed: thickness, surface regularity against its class, cracking and hollowness, curing and drying, and moisture before floor finishes go down.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • BS 8204, Screeds, bases and in situ floorings
  • The project specification and drawings

The questions

Where and when

  1. Area
  2. Date

Checks

  1. Thickness as specified
  2. Surface regularity within its class (straightedge)
  3. No cracks, curling or hollow areas
  4. Cured and protected as specified
  5. Moisture (relative humidity, hygrometer) before finishes
  6. Photos

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.

More floors and finishes templates

Sitro is a product of Prothopic Limited, registered in England and Wales, company number 17220075. Privacy · Terms · DPA