Templates / Floors and finishes
Screed check
Checklist · Each area
The check of a screed: thickness, surface regularity against its class, cracking and hollowness, curing and drying, and moisture before floor finishes go down.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- BS 8204, Screeds, bases and in situ floorings
- The project specification and drawings
The questions
Where and when
- Area
- Date
Checks
- Thickness as specified
- Surface regularity within its class (straightedge)
- No cracks, curling or hollow areas
- Cured and protected as specified
- Moisture (relative humidity, hygrometer) before finishes
- Photos
Sign-off
- Inspected by
- Date and time
- Signature
A template to adapt to your site, not legal advice.