Pre-plaster inspection

Checklist · Once per plot, before boarding

Checks first fix and the structure before walls and ceilings are closed in.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • The project's specification and the building warranty's pre-plaster stage

The questions

Before closing in

  1. Studs, noggins and fixings in place for fittings
  2. Electrical first fix complete, cables protected
  3. Plumbing first fix complete, pressure tested
  4. Insulation fitted with no gaps
  5. Fire stopping and cavity barriers in place
  6. Acoustic measures as specified
  7. Vapour control layer sealed
  8. Inspected by
  9. Signature

A template to adapt to your site, not legal advice.