Templates / Electrical

Electrical first fix check

Checklist · Each area, before it is covered

The check of electrical first fix before boarding: cables in safe zones or protected, the right cable sizes, back boxes at the right heights, fire-stopping where cables cross walls, and supports.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • BS 7671, Requirements for electrical installations
  • The project specification and drawings

The questions

Where and when

  1. Plot or area
  2. Date

Checks

  1. Cables in safe zones or protected (earthed covering or 50 mm deep)
  2. Cable sizes and circuits as the design
  3. Back boxes at the right heights (Part M)
  4. Fire-stopping where cables pass through fire walls
  5. Cables supported so they won't fall in a fire
  6. Photos

Sign-off

  1. Inspected by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.