Templates / Drylining and interiors
Drylining and partition QA
Checklist · Each room or area
The check of partitions and drylining: the system built as specified, stud centres, noggins for fixings, boards and screws, acoustic insulation and sealing, and the finish.
Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.
The law and guidance behind it
- The board maker's system specification
- The project specification and drawings
The questions
Where and when
- Room or area
- Date
Checks
- System and boards as specified
- Stud centres and head and base tracks as the system
- Noggins for fixings in place
- Acoustic insulation fitted, no gaps
- Perimeter sealed as specified
- Joints, screws and finish to the specified level
- Photos
Sign-off
- Inspected by
- Date and time
- Signature
A template to adapt to your site, not legal advice.