Templates / Mechanical and plumbing

Commissioning record

Form · Each system

Records the commissioning of any building system: the system, the method and values set, the commissioning sheets, witnesses and anything left open.

Use it in Sitro: add it to a project and fill it on a phone, free for 14 days.

The law and guidance behind it

  • CIBSE Commissioning Codes (referred to, not copied)
  • Building Regulations 2010, Regulation 44 (commissioning of fixed building services)
  • The project specification and drawings

The questions

The system

  1. System and area
  2. Commissioned by
  3. Date

Result

  1. Values set and measured (or see the sheets)
  2. Commissioning sheets
  3. Outcome
  4. Items left open (write "None" if none)
  5. Witnessed by

Building control

  1. Commissioning notice given to building control where required (within 5 days)

Sign-off

  1. Recorded by
  2. Date and time
  3. Signature

A template to adapt to your site, not legal advice.